Skip to content

Who you are · Service managers · Roofing

Coach the roofing crew from the record, not the rumor.

The service manager’s job at a roofing shop is quality at speed: which techs are drowning, which jobs went sideways, which callbacks were preventable. That is a reading problem, and the record was built to be read.

Service managers · Roofing

the service manager

Reads
Estimate · The work · Receipt
The work
Storm response · The claim file · Production
Up against
Callbacks arrive as mysteries · Coaching runs on vibes · The best tech’s knowledge is trapped
The bill
$99 / month, this chair included
This chair, at a roofing shop. One posted price, every chair included.

The chair’s real problems

What the service manager at a roofing shop is up against.

  • Callbacks arrive as mysteries

    Without photos, notes, and the timeline, every callback becomes a he-said dispute instead of a fixable pattern.

  • Coaching runs on vibes

    Who quotes well, who closes, who leaves money on the truck, guessed from memory instead of read from work.

  • The best tech’s knowledge is trapped

    The veteran’s habits (the photos they take, the notes they leave) should become the crew’s floor, not their secret.

The work

The days roofing contractors run.

  • 01

    Storm response

    Leads from every channel, triaged by urgency and address, with inspections assigned by neighborhood instead of by whoever answered the phone.

  • 02

    The claim file

    Photos, measurements, estimates, supplements, and approvals versioned on the job, not lost across three inboxes.

  • 03

    Production

    Crews, materials, and permits scheduled together. Retail jobs skip the claim steps and run estimate to contract to production.

What the record hands you

Your view of the roofing product.

  • Every job tells its story

    Photos, notes, times, and signatures in one place. The callback conversation starts from evidence.

    The apps
  • The week by tech

    What each tech ran, quoted, and closed: the coaching conversation with numbers in it.

    The week
  • The book keeps quotes honest

    Estimates built from one price book mean price consistency isn’t a personality trait.

    Estimates

The old way

What the whiteboard costs roofing contractors.

  • The storm buries the office

    Lead volume that outruns intake becomes inspections that never happen.

  • The claim dies in email

    Paperwork scattered across threads is how approvals stall and supplements get missed.

  • Supplements left on the roof

    Commonly missed items (drip edge, ventilation, ice and water shield) are recovered by checklist, not by memory.

The day, from this chair

Three moments that change.

  1. 8:00

    Yesterday’s exceptions

    The jobs that ran long or came back, read from the record before the trucks roll.

  2. 13:00

    The ride-along, aimed

    You ride with the tech whose numbers say they need it, not whoever’s turn it feels like.

  3. 17:00

    The callback, closed

    Photos from the original visit settle in two minutes what used to take two phone calls.

Straight answers

What the service manager asks first.

  • Does the service manager cost a seat?

    No. $99 is the company, not the seat. Every chair on this page is included, from the owner to the newest tech, and a hire changes the crew rather than the software bill.

  • Can we bring our roofing records?

    CSV and Excel, Documents, The API: we map the columns and read what we can, with a dry run you inspect before anything is live. What we cannot take stays a limit you can see.

Start

Built for the service manager at a roofing shop, too.

One posted price for the company: every chair on this page included, from the owner to the newest tech.

Coming from a suite? We’ll extract your records.

Rather talk first? Email the team.