The punch list is not a text thread.
Structured cabling, access control, cameras, and building controls run as phased installs with service behind them: crews, change orders, and the closeout on one record instead of a binder and a group text.
Controls & low voltage
Tue · 7:42
- Northside Clinic · Ph 2Pull day · crew of 37:00
- Optic Labs · Door 4Reader offline · service9:00
- Walkthrough · GC punchPhase 1 sign-off13:00
The service call runs beside the install without borrowing its crew.
The work
The days this trade runs.
The phased install
Rough-in, trim, commission: days and crews tracked against the phase, with photos and notes accumulating where the walls will close.
The service call
A reader offline or a camera dark, dispatched with the site's install history: what was run, where it lands, who commissioned it.
The retrofit
Small works and upgrades quoted from the book and scheduled between project days, not lost behind them.
The old way
What the whiteboard costs.
The punch list lives in a text thread
Items agreed on a walkthrough vanish into phones. A punch item that is not on a record is a callback with your margin attached.
The change order never gets billed
Extra drops added in a hallway conversation are real cost. Unwritten, they are a donation to the GC.
The closeout binder eats a week
Photos, test results, and as-built notes captured on the job as it runs mean closeout is an export, not an archaeology dig.
Controls & low voltage
Built where the floor is torn up.
Phases, crews, and materials tracked from the same record the same-day board runs on.
The quiet revenue
The work that comes back.
Tracked on the record, surfaced on schedule, without anyone chasing it.
per phase
The draw bills itself
Progress billing against completed phases, invoiced when the phase closes, not when someone remembers.
at closeout
The record becomes the as-built
What was actually run, photographed as it went in: the file the service side lives on for the next decade.
after warranty
The service agreement
Installed systems age into service contracts. The install record makes that quote a formality.
On the roadmap
Coming for controls & low voltage.
Work in flight, not a commitment to a date. The rest of the plan is on the roadmap.
Projects, built for this trade's phases
Next
Truck and warehouse inventory
Next
Other trades
Start
One board for controls and low-voltage contractors.
$99 a company. Unlimited people: the whole crew. Plus metered usage. $15 included each month.
Waitlist open. One email when your invite is ready, nothing else.
Coming from a suite? We’ll extract Tuesday.
Rather talk first? Email the team.