Skip to content

Electrical · Scheduling

The electrical day, on one board.

Every electrical job on one board the office runs and the trucks read: the morning built once, the emergency dropped in without re-sorting it, and Arrive tapped from the cab.

Electrical

Tue · 7:42

  • Panel upgrade · 200AQuoted from the assembly book8:00
  • TI rough-in · phase 1Inspection Thursday9:15
  • EV charger installLoad calc attached1:00

Rough-in, trim, and final each carry their own budget.

In Core today. One posted price, unlimited people.

The work

The days the board has to hold.

  • 01

    Residential service

    Panel and service upgrades, EV chargers, whole-home surge, quoted from the assembly book in the driveway.

  • 02

    Commercial TI

    Rough-in, trim, and final on one job with progress billing today. Phases with their own labor and material budgets, billed on AIA G702/G703 draws, when Projects ships (Next).

  • 03

    New construction

    Estimate to final inspection on one record: permits, inspections, and phase billing coordinated.

  • 04

    The safety record

    Lockout/tagout, arc-flash assessment, PPE photo, signature. The job does not close without them.

Why it matters

The argument, in three rows.

  • A truck that’s driving isn’t earning

    Jobs sequence by geography so the day spends its hours on work, not windshield. The gap in the afternoon is visible at 6:40, not at 2 p.m.

  • The day goes sideways on schedule

    A burst line jumps the queue; the board reshuffles; every affected phone updates itself. The emergency is an insertion, not a meltdown.

  • The customer hears it first

    Confirmations, delay notices, and status texts go out from the board, before the customer wonders, not after they call.

Electrical · Scheduling

The board is the day.

Software for the trades where the schedule is the business, and the record has to keep up with the truck.

The old way

What the whiteboard costs.

  • Safety lives in binders

    Checklists on paper cannot stop a job from closing without them. A record can.

  • Costing lands after the overrun

    Budget versus actual that arrives at month end is a report, not a decision.

  • The aging panel is flagged and forgotten

    Techs see the upgrade on site; without a record it never becomes a proposal.

Up close

How it runs.

  • 01

    One Friday, start to finish

    A cancellation at 9, an emergency at 11, a truck stuck at 2, and a board that ends the day full anyway, with every change logged and every customer told.

  • 02

    Capacity, planned ahead

    Recurring visits place themselves, and the weeks ahead show how booked each day already is, so the quiet week gets a capacity push before it arrives.

  • 03

    The right tech, not just the next one

    Skills and licenses match to the work, and multi-day installs hold their crew across the days.

Straight answers

What electrical contractors ask.

  • What does Thorbis cost for electrical contractors?

    $99 per company per month, unlimited people, every module as it releases. Plus metered usage. $15 included each month. Nothing on this page is a tier.

  • Is scheduling a separate module?

    No. Scheduling & dispatch is in Core, on the same record as the board, the estimate, and the invoice, so the electrical job never leaves the system it started in.

  • Is it built for electrical contractors specifically?

    The record is the same for every trade; what changes is the work on it. For electrical contractors that means residential service, commercial ti, new construction, and the safety record, which is the day this page is written around, and the sample rows on it are electrical jobs.

Start

Scheduling for electrical contractors, on one record.

$99 a company. Unlimited people: the whole crew. Plus metered usage. $15 included each month.

Coming from a suite? We’ll extract your records.

Rather talk first? Email the team.