Skip to content
Thorbis

Who you are · Facilities managers

The building's side is being designed. With you, if you want.

Thorbis today is the contractor's product: the crews serving your buildings run it. A facilities view of those same records is in design with a small operator council, and this page is honest about that line.

Read this before anything else

There is no facilities module for sale today, and this page will not pretend otherwise. Present-tense claims above describe the contractor product your vendors can run now; the facilities side ships when the operator council says it's credible.

The full honest version

The chair's real problems

What the facilities manager is up against.

  • Your history lives in vendors' filing cabinets

    Years of work on your buildings exists as PDFs in other companies' systems: theirs to keep, yours to re-request.

  • Status means calling someone

    A work order's state (received, scheduled, on site, done) shouldn't require a phone call per question.

  • The spend resists reading

    What each building actually costs, by system and by year, is a quarter-end reconstruction instead of a running record.

Facilities managers

Two sides. One record.

The building and its contractors already share the work. The record should be shared the same way. That's the design brief.

What the record hands you

Your view of the product.

  • Contractors who keep real records

    A Thorbis contractor documents every visit: dated, photographed, signed. Hiring one raises the quality of your paper today.

  • A direction built around your chair

    The facilities thesis (the building's own view of its record) is public, in the conditional, on its own page.

  • A seat at the design table

    The Facilities Operator Council is five to ten operators shaping what ships first. Names stay private by default.

The day, from this chair

Three moments that change.

  1. Today

    The honest present

    Your Thorbis-running vendors hand you better records than the industry default. That's the shipped part.

  2. In design

    The shared record

    Requests that become the contractor's job, with status you can see, being shaped with the council now.

  3. When credible

    Early access

    Council operators run the facilities side first, labeled early access, before a line of it is sold here.

Start

Built for the facilities manager, too.

One posted price for the company: every chair on this page included, from the owner to the newest tech.

Waitlist open. One email when your invite is ready, nothing else.

Coming from a suite? We’ll extract Tuesday.

Rather talk first? Email the team.